- Earthwork layout plan – should include existing level, proposed level, orientation of the building, location of silt trap, location of wash trough, total cut & fill, temporary earth drain system, proposed slope, existing slope, etc.
- Cross section of earthwork- show the varies of existing & proposed platform level
- Silt trap design & detail - for temporary earth drain
- Wash trough detail – to wash dump truck tire before move in & out to make sure public road is always clean.
- Calculation of cut & fill – to show whether the project have to import earth or export earth, use Cross Section Method or Contour Method or Grid method to calculate cut & fill.
- Earthwork specification – requirements to be followed during construction
- Piling specification – requirements for piling machine to be used during piling work, i.e, hydraulic hammer, diesel hammer, injection pile, etc, usually to avoid noisy during piling.
Sunday, January 8, 2017
Preparation of earthwork report and detail drawings
Preparation of earthwork report and detail drawings